Efisiensi Penggunaan CBC Calculator sebagai Alat Bantu Pengukuran Produktivitas Metode Crew Balance Chart
DOI:
https://doi.org/10.35166/jipm.v7i2.50Keywords:
Android-based application, Construction productivity, Crew Balance Chart, EfficiencyAbstract
Work productivity in construction project operations is often measured using non-scientific methods due to the relatively short time required. Productivity is typically calculated based on daily production output, which is measured in the afternoon. One scientific method for measuring productivity is the Crew Balance Chart (CBC). This study aims to evaluate the efficiency that can be achieved through an Android-based application specifically designed to streamline data processing and reduce measurement time. The method used is a comparative analysis of productivity measurement duration by comparing standard CBC methods with the tools, using a tower crane operation as a case study. The findings reveal an efficiency increase of 142.1%. The use of the Android-based application reduced measurement duration by 1,11 hours, from 3,76 hours to 2,64 hours. It is important to note that the application assists only in the data processing stage, while data collection and analysis continue to follow standard CBC procedures.
References
Abdelkhalek, H. A., Refaie, H. S., & Aziz, R. F. (2020). Optimization of time and cost through learning curve analysis. Ain Shams Engineering Journal, 11(4), 1069–1082. https://doi.org/10.1016/j.asej.2019.12.007
Aziz. (2023). Studi inisiasi penggunaan metode pengukuran produktivitas metode crew balance chart berbasis mobile application. Universitas Jenderal Soedirman.
Dewangga. (2023). Studi inisiasi penggunaan metode pengukuran produktivitas method productivity delay model berbasis mobile application. Universitas Jenderal Soedirman.
Dozzi, S. P., & AbouRizk, S. M. (1993). Productivity in construction. Institute for Research in Construction, National Research Council Ottawa.
Faisal, U. F., & Fansuri, I. (2023). Pengembangan teknologi digital terhadap pemenuhan keselamatan konstruksi di Indonesia. Indonesian Journal of Construction Engineering and Sustainable Development (CESD), 6(2), 35–45. https://doi.org/10.25105/cesd.v6i2.18811
Hartono, P. E., & Alifen, R. S. (2013). Program perhitungan efektivitas waktu dan biaya pemakaian tower crane. Jurnal Dimensi Pratama Teknik Sipil, 2(2), 1–9. https://publication.petra.ac.id/index.php/teknik-sipil/article/view/1204
Hernandi, Y., & Tamtana, J. S. (2020). Faktor-faktor yang mempengaruhi produktivitas pekerja pada pelaksanaan konstruksi gedung bertingkat. JMTS: Jurnal Mitra Teknik Sipil, 3(2), 299–312. https://doi.org/10.24912/jmts.v3i2.6985
Januardi, R., Nugroho, P. S., & Mulyono, B. (2023). Persepsi pengguna dalam mengukur kinerja operasi konstruksi berbasis sampling menggunakan analytical hierarchy process. Jurnal Ilmiah Telsinas Elektro, Sipil, dan Teknik Informasi, 6(2), 112–121. https://doi.org/10.38043/telsinas.v6i2.4517
Januardi, R., Sudibyo, G. H., Saputro, D. N., & Nugroho, P. S. (2021). Studi produktivitas operasi konstruksi pekerjaan dinding bata ringan pada proyek gedung bedah RSUD Banyumas. Seminar Nasional Ketekniksipilan, Infrastruktur dan Industri Jasa Konstruksi (KIIJK), 1(1), 67–72. https://prosiding.uika-bogor.ac.id/index.php/kiijk/article/view/335
Kartika, N., Robial, S. M., & Pratama, A. (2021). Analisis produktivitas tenaga kerja pada pekerjaan kolom di proyek pembangunan gedung pemda kabupaten Sukabumi. Jurnal Momen Teknik Sipil Suryakancana, 3(2), 103–112. https://doi.org/10.35194/momen.v3i2.1207
Lionggono, L. L., Saharuddin, A., Hartanto, D. H. D., & Leong, H. (2023). Pemodelan rodit untuk menghitung gaya lateral pada pondasi tiang pancang ujung bebas pada tanah kohesif menggunakan metode Brom berbasis MIT app inventor. G-Smart, 7(1), 66–80. https://doi.org/10.24167/gsmart.v7i1.10252
MIT. (2024). MIT App Inventor. https://appinventor.mit.edu/about-us
Nanda, R. P., Damarla, R., & Nayak, K. A. (2022). Android application of rapid visual screening for buildings in Indian context. Structures, 46, 1823–1836. https://doi.org/10.1016/j.istruc.2022.10.140
Nataadiningrat, B. B., Prabowo, A. W., Rasmawan, I., Putri, A. T., Abduh, M., & Wirahadikusumah, R. D. (2020). Analysis of NATM tunneling method using cyclone modeling and simulation tools. IOP Conference Series: Materials Science and Engineering, 933(1), 012002. https://doi.org/10.1088/1757-899X/933/1/012002
Peurifoy, R. L. (1970). Construction planning, equipment, and methods. McGraw-Hill.
Pranata. (2021). Analisis pengoperasian tower crane untuk pekerjaan pengecoran struktur kolom. Jurnal Ilmiah Desain & Konstruksi, 19(1), 75–83. https://doi.org/10.35760/dk.2020.v19i1.2698
Rizky. (2022). Analisis beserta peningkatan produktivitas pekerjaan tiang pancang menggunakan metode chart. Universitas Jenderal Soedirman.
Sasmita, A. A., Fiara, A., Utama, A. B., & Islami, R. C. (2023). Pengukuran produktivitas tenaga kerja pemasangan plafon U-baffle menggunakan metode time study dan productivity rating. Jurnal Inovasi Konstruksi, 2(2), 75–87. https://doi.org/10.56911/jik.v2i2.75
Soemardi, B. W., Kusuma, B., & Abduh, M. (2020). Technology assessment in Indonesian construction industry. IOP Conference Series: Materials Science and Engineering, 849(1), 012077. https://doi.org/10.1088/1757-899X/849/1/012077
Suharto, I. P., & Sulistio, H. (2020). Produktivitas pekerja dalam pekerjaan plesteran dinding bata dengan metode crew balance chart. JMTS: Jurnal Mitra Teknik Sipil, 3(4), 1373–1382. https://doi.org/10.24912/jmts.v3i4.8378
Tai, H.-W., Chen, J.-H., Cheng, J.-Y., Hsu, S.-C., & Wei, H.-H. (2021). Learn curve for precast component productivity in construction. International Journal of Civil Engineering, 19, 1179–1194. https://doi.org/10.1007/s40999-021-00621-z
Tanne, Y. A., & Indrayani, N. L. A. (2023). Review of construction automation and robotics practices in Indonesian construction state-owned enterprises: Position in project life cycle, gap to best practice, and potential uses. Architecture, Structures, and Construction, 3(3), 373–389. https://doi.org/10.1007/s44150-023-00098-5
Tsolas, I. E. (2013). Modeling profitability and stock market performance of listed construction firms on the Athens Exchange: Two-stage DEA approach. Journal of Construction Engineering and Management, 139(1), 111–119. https://doi.org/10.1061/(ASCE)CO.1943-7862.000055
Ugulu, R. A., & Allen, S. (2018). Using the learning curve theory in the investigation of on-site craft gangs’ blockwork construction productivity. Built Environment Project and Asset Management, 8(3), 267–280. https://doi.org/https://doi.org/10.1108/BEPAM-09-2017-0067
Ulhaq. (2023). Kajian tantangan penerapan pengukuran produktivitas operasi konstruksi menggunakan five minutes rating dan work sampling bagi kontraktor pelaksana. Universitas Jenderal Soedirman.
Wirabakti, D. M., Abdullah, R., & Maddeppungeng, A. (2017). Studi faktor-faktor penyebab keterlambatan proyek konstruksi bangunan gedung. Konstruksia, 6(1), 15–29. https://doi.org/10.24853/jk.6.1.%25p
Yates, J. K. (2014). Productivity improvement for construction and engineering: Implementing programs that save money and time. ASCE Press. https://doi.org/10.1061/9780784413463
Zaher, M., Greenwood, D., & Marzouk, M. (2018). Mobile augmented reality applications for construction projects. Construction Innovation, 18(2), 152–166. https://doi.org/10.1108/CI-02-2017-0013
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Journal of Infrastructure Policy and Management (JIPM)
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.